The project of New Wellful Miluo Hongshan farm with a scale of 6000 sows is about to be delivered for production. The total construction period of equipment installation is expected to be 92 days. As the equipment supplier of this project, Big Herdsman is responsible for the design and construction of the environmental control system, feeding system, water supply system, illuminating system and high-pressure washing system of the project. The design concept of combining equipment and building organically runs through the whole process.